Melva Lane Water Main Extension

Updated:  10/11/18  Melva Lane is a dead-end street leading to the main MMUA wastewater pump station.  The existing 6-inch water main leading to the facility from the Black Horse Pike is old and undersized.  Plans are being prepared to replace that water main with an 8-inch ductile iron main.  The extension will be constructed by Authority forces.